- Apply at an ambient temperature of +5°C to +35°C and a relative humidity of 70% or less. The adhesive in the cartridge should be between +20°C and +25°C.
- Drill the hole. Remove dust thoroughly with a hole-cleaning brush and compressed air.
- Remove the cap, screw on the static mixing nozzle and load the cartridge into a standard 300 ml caulking gun.
- Before use, dispense a 10–15 cm bead (20–30 ml) until the mixed adhesive is uniform in color.
Hollow brick. Fill the mesh sleeve completely with adhesive.
| Thread size | Hole diameter | Hole depth | Mesh sleeve (diameter × length) |
|---|---|---|---|
| M8 | 12 | 85 | 12×80 |
| M10 | 16 | 90 | 16×85 |
| M12 | 16 | 135 | 16×130 |
| M16 | 20 | 90 | 20×85 |
Concrete, aerated concrete and solid brick. Insert the nozzle to the bottom of the hole. Withdraw it as you dispense the adhesive, filling the hole two-thirds full.
| Thread size | Hole diameter | Hole depth |
|---|---|---|
| M8 | 10 | 60–160 |
| M10 | 12 | 70–200 |
| M12 | 14 | 80–240 |
| M16 | 18 | 100–320 |
| M20 | 24 | 120–400 |
| M24 | 28 | 140–480 |
Insert the threaded rod to its full depth with a clockwise twisting motion. Allow the adhesive to cure fully before securing the fixture, tightening the fastener to the required torque or applying the service load.
Keep pauses between applications under 3 minutes to prevent the adhesive from curing in the mixing nozzle.
| Substrate temperature | Working time (min) | Time before loading (min) |
|---|---|---|
| +5°C | 25 | 120 |
| +10°C | 15 | 80 |
| +20°C | 6 | 45 |
| +30°C | 4 | 25 |
| +35°C | 2 | 15 |
















