- The new valve design resists sticking and ensures reliable activation. Reduces propellant loss during storage by 40%.
- Foam yield — up to 60 liters.*
- Post-expansion is 25% or less.
- Maximum width of sealing joint at 0°C – 80 mm (TM 1006:2013).
- Low deformation pressure on the building structure when curing – not more than 7.5 kPa. (TM 1009:2013).
- Tack-free time – up to 10 minutes*.
- Cutting time – up to 20 minutes*.
- Dimensionally stable throughout the joint’s service temperature range.
* At a temperature of +23°C and a humidity of 50%.








