- Work is recommended at a temperature of +5-35°C, with the gel at +15-20°C.
- Before applying the product, clean and degrease the surfaces with KU-9100 Silicone Remover. Let dry.
- Shake the bottle well before use.
- Spread the gel evenly over the whole surface of the male thread. For blind joints, several drops can be applied directly into the threaded hole.
- Assemble the joint and leave it to cure. The product cures only when confined between metal surfaces in the absence of air.
- Wipe off excess product with a rag.
- Fixture strength is reached in 10-30 minutes (depending on the metal, the gap and the temperature); full cure takes 24 hours.
- To make disassembly easier, heat the joint to 200-250°C with a heat gun or a blowtorch.
Leak testing:
- Up to 1 atm — 20 minutes after fixture strength is reached.
- Up to 10 atm — another 30 minutes later.
- Up to 40 atm — after 24 hours.
Warning! Increase the pressure gradually when leak testing the joint and putting it into service.